Central Geo has 19 years of successful works in the markets. We have built a reputation as one of the leading demolition companies in Malaysia.
YEAR
ACHIEVEMENT
2000
-
Established as Central Geo Equipment & Machinery (M) Sdn Bhd.
-
Actively involved in construction equipment machinery trading and rental.
2007
-
Started to involve as contractor and specialist role in various demolition & heavy lifting jobs around Malaysia.
2009
-
Awarded demolition contract of 9 bridges by MMC-Gamuda JV for Electrified Double Track Project (Ipoh - Padang Besar).
2011
-
Awarded The Best Subcontractor Safety Award by MMC-Gamuda JV for Electrified Double Track Project.
2012
-
Established as Central Geo Sdn Bhd.
2013
-
Awarded demolition of 8-storey Clubhouse by SP Setia in Bayan Lepas Penang, using the largest high reach demolition machine in Malaysia at that time.
2015
-
Introduced the foundation pile removal technology & successfully implemented in Klang Valley MRT Project.
-
Awarded contract for extraction of more than 500 nos of RC square pile and micro piles at MRT site.
2016
-
Awarded advance works package of KWMRT Line 2 for the demolition of Block C Bangunan Sultan Abdul Samad including some preservation works of the heritage building.
-
This is the first Central Geo's demolition work awarded directly by MRT Corporation.
2017
-
Awarded most of the demolition work for MRT line 2 Underground Package by MMC Gamuda KVMRT including 16-storey police quarters, 5-storey KLCC Carpark, 8-storey Wisma Awal & other associated buildings.
-
Malaysia biggest all-terrain mobile crane mobilized for the lifting of the diamond cut section of the structure of the top floor as part of the demolition method used for the 16-storey police quarters demolition project.
-
Introduced Mobile Space & diversified as a rental service provider for onsite office & sales galleries.
-
Awarded majority demolition works under MRT line 2 Elevated Package by Sunway Construction (Package V201), IJM (Package V203) & TRC (Package V205). About 200 various size buildings to be demolished along the route of the MRT line 2 Elevated Package.
-
Introducing our innovative self-modified "Flying Elephant" demolition machines which specialise for the demolition of chimney/silo of up to 140 meters.
-