KEY PROJECT 04

KLCC EAST UNDERGROUND STATION (KVMRT LINE 2) 

Demolition Works of Multi-storey Carpark (Superstructure & Substructure) 

DAY

10

DAY

45

DAY

30

DAY

75

11 WEEKS ONLY  TO FULLY DEMOLISH

Challenges

• Precast structure buildings with hollow core slab.

• Require extra attention to structure stability during demolition.

• Surrounded by high end high-rise & low-rise residential building.

• Near to KLCC Twin Tower tourist attraction area.

 © 2018 Central Geo Sdn Bhd. All Rights Reserved.